7.12.2007

More Fab Pics!

Construction of the museum continues to move along steadily here in Golden. Meanwhile, at the design studios of Quatrefoil in Maryland, pieces of the museum are being fabricated. Here are some more photos of the fabrication process of the reader rails.



7.10.2007

Moving Mountains

As you may know, we will prominently feature a very large model of Mt. Everest in the new museum. Fourteen feet square, the model was crafted using aerial images and maps created by a team under Bradford Washburn.

You may have seen the model in the past, as it was on display at the Denver Museum of Nature & Science some years ago. Since that time, it has been in the care of the American Alpine Club. Today, we handed the model over to Condit, a three-dimensional marketing specialist that will help us to restore the model in preparation for its installation in the museum.

The four sections of the model were in storage and needed to be brought to Condit's studios in Denver. Today, we literally moved mountains.



6.28.2007

Faux Rocks!

The men from Monolithic have arrived bearing rocks. Experts in the field of artificial rock sculpting, we have contracted them to create granite spires within the museum, on which we will have historic and modern climbing mannequins.

Their process is quite interesting (following the photographs): (1) A scale model (12" tall) is created at their studios in Boulder, and then a full scale model is cut to mimic that design. (2) Much like puzzle pieces, the rocks are reassembled on site. No, they are not that heavy, but they serve as a great core material over which to spray concrete, which can then be further sculpted to mimic the rock of choice. (3) Two spires are being built, one of which is much taller and will represent a mixed face of rock and ice. This is where visitors will see the modern climber ascending. (4) The joints are filled with special foam in preparation for the spraying of concrete. That will happen in a month's time.

Meanwhile, we anxiously await the modeling and installation of the crevasse.







6.20.2007

International Attention

As the construction of the museum gears up, so too does our marketing campaign. Many thanks go to Tamotsu Nakamura, Editor of the Japanese Alpine News, for getting us a mention in Volume 8 (May 2007) of that acclaimed journal. Be on the lookout for other articles and essays in your favorite climbing magazines and journals in the coming months.



6.18.2007

Construction, Day 52: The Mezzanine

The real building has begun.

The mezzanine, which will eventually serve as the entrance to the museum, as well as the visitors' first experience of the mountain-like environment, has begun to take shape.

The structure was welded together and the concrete slab was poured last week. Next steps include building the arching staircase that will take visitors over the crevasse feature of the entrance, and down to the level of the museum, into the self-selecting gallery. This format allows visitors to go anywhere they please, at their own pace.

Keep watch for more photos of that phase of construction as they are sure to be exciting.





6.14.2007

New Artifacts

Artifacts keep coming to us here at the museum. Some of the details have yet to be worked out on major acquisitions, but no less important are the treasures that people come across when they're cleaning out their garage.

This 10th Mountain Division tent came to us recently, and so we set it up outside of the AMC to give it some fresh air. The label reads "Dickey Mfg. 1943."

We'll keep you posted with more news on acquisitions as they become final. And keep checking back with us here as images of the construction of the mezzanine are soon to appear.

And if you uncover any treasures in your garage, be sure to let us know. Contact information is available to the right.



5.25.2007

Construction, Day 36 : Fireworks

We've been anxiously awaiting this day for quite a while here at the BWAMM. The beam--the really big beam that seems to be holding up part of the ceiling, and the floor of the auditorium above--has begun to come down, in pieces.

The previous post illustrates the work that went into crafting a new steel structure meant to take the place of this old, riveted beam. But at 150 pounds a linear foot, we knew the removal of this big beam would serve as a distraction for days. And distract it did. From the cascading sparks of the oxyacetylene torches, to the wobbling scaffolding that shivered under the weight of these hefty pieces of metal, the past two days have been entertaining to say the least.

But what a view we will have once it is finally gone and the mezzanine is put into place.

Check out these images and let us know how we're doing. Comments are always welcome. Just click the link below.